System: Wave & Tide System
Watch “Wave System Pushed to Full Power After Marine Stress Event” on YouTube

After the June 12, 2026 introduction of 75 Florida Glass Shrimp and 18 hermit crabs caused overnight low-oxygen stress, Josue increased the wave and tide system in the Seagrass Meadow to full power, resolving the deficit despite real mechanical risk: the belt, bearings, and 3D-printed motor mount have all failed before. A redesign is now underway to separate tide and wave motion into independent chambers driven by a brushless DC servo and industrial bearings, built to handle far more load than normal operation ever demands.

Related Subjects