Field Note · June 11, 2026

Weekly miniBIOTA Update: June 11, 2026

A weekly field note from the miniBIOTA system: what changed, what was observed, and what we are watching next.

Mud Crab

This Field Note

What Changed And What We Are Watching

Engineering System

Six junction boxes are ready for the next hardware step

Six black PETG electrical junction boxes were designed and printed for the biome-control power setup. They’re ready for the next hardware step, but the work shouldn’t be described as installed yet.